Kevin McKeon Construction LLC.

Laundry Room Redo

This renovation turned out amazing! This project included a small amount of drywall patching, and priming and painting the walls and ceiling. A new sink was installed and sink supply lines moved to make room for the new wall cabinets. Two new lights were installed and wired in a 3 way switch format. The light bulbs were replaced with LED florescent size tubes so you change them very rarely. The floors were painted with an epoxy based paint and coated with a high gloss protective coating. Two broom closets, two upper cabinets, two sections of custom base cabinets, and a custom bench were all installed. Base molding was added throughout. A wire shelving system was added it both the closet and above the main counter top. Custom coat hooks were also made. New hard wear was added throughout.

Door Replacement

Did a swap of the old damaged bi-pass doors for new bi-pass doors. Added new shinny hardware, a fresh coat of paint and rubber bumpers to keep the doors from slamming.

Closet Overhaul

Here I completely replaced the plaster ceiling that had collapsed, due to a leak, with all new drywall, removed old wallpaper, sanded, primed, painted the inside and installed brand new bi-fold doors. I also replaced an old basement door with a six panel door that match these bi-fold doors.