This renovation turned out amazing! This project included a small amount of drywall patching, and priming and painting the walls and ceiling. A new sink was installed and sink supply lines moved to make room for the new wall cabinets. Two new lights were installed and wired in a 3 way switch format. The light bulbs were replaced with LED florescent size tubes so you change them very rarely. The floors were painted with an epoxy based paint and coated with a high gloss protective coating. Two broom closets, two upper cabinets, two sections of custom base cabinets, and a custom bench were all installed. Base molding was added throughout. A wire shelving system was added it both the closet and above the main counter top. Custom coat hooks were also made. New hard wear was added throughout.