Here we re-sloped the patio to have to rain water flow away from the newly replaced basement door. Sand was added to slope it correctly. Poly-metric sand was added between the joints to block weeds from growing. A 4 inch drain was added to help deal with the water run off and move it further from the house. Stepping stones were also re-leveled. The leaning retaining wall was corrected and mulch added to the top.
Previous Post
Next Post
Comments are closed.


















